After the movable plate ramp is set up, the main engine of the crawler crane logs into the pallet car from the rear and drives slowly in a straight line. At the same time, the eye can observe the distance between the car and the left and right, and the two tracks cannot be deviated. Z tests the skill of the operator. When the crawler crane is half logged in, the whole main engine will be in a semi-suspended state. Operators should maintain the overall balance of the crawler crane equipment to avoid rollover.
After the crawler crane transport vehicle arrives at the scene, the main engine is driven down from the transport vehicle in the forward direction, and there must be someone around to command to ensure that the two tracks drive evenly on the movable plate. Hook, counterweight block, main boom, etc., are unloaded by special crane, and all parts are stacked in the open space beside them, ready for installation. Pay attention to the installation sequence, and the whole transportation process is completed.